Completed Projects

Goderich Street Images © Copyright Red Images Fine Photography
  • Kings Square 4

    Location:
    Perth CBD WA
    Consultant:
    COX Design Group
    Status:
    Completed
    Completion:
    Mid 2015
    The Kings Square 4 Project is a 12 level office tower in the Perth CBD. Kings Square 4 is a part of the Kings Square Precinct which is strategically located within the $5.2 billion Perth City Link project. Ascent Structural & Architectural Steel was awarded the structural steel package for the…
  • BAE Systems Australia

    Location:
    Henderson WA
    Consultant:
    DesignInc
    Project Value:
    $5.1 million
    Status:
    Completed
    The BAE Systems Office complex designed by DesignInc is a double story metal framed building completed in mid-2014. Situated within the highly secure BAE Henderson complex and constructed within 150 meters of the ocean, this development required a highly specified and durable structure to stand up to the extreme conditions.   The…
  • 85 Old Perth Rd

    Location:
    Bassendean WA
    Project Value:
    $28 million
    Status:
    Completed
    Completion:
    Late 2014
    The Old Perth Rd development is a modern apartment building situated in the heart of Bassendean WA. The large 5 level development completed in late 2014, comprises of 40 modern apartments and a large lower-ground commercial space. Ascent Structural Steel Supplied and installed all of the structural steel for this modern development.…
  • WestEnd Mixed Use Development

    Location:
    Yokine WA
    Consultant:
    Corpraxis Architects
    Status:
    Completed
    The WestEnd Apartments building designed by Corpraxis Architects and situated in Yokine WA is a mixed use development made up of 3 main buildings which included both commercial and residential apartments. Ascent Structural Steel was contracted to supply and install all of the structural steel for these contemporary developments which…
  • Roebourne Regional Camp

    Location:
    Roebourne WA
    Consultant:
    Cox Howlett & Bailey Woodland
    Project Value:
    $13 million
    Status:
    Completed
    Roebourne Regional Camp was a large institutional facility that comprised of 3 prisoner accommodation buildings and 5 facility buildings situated at the top end of Western Australia. The Works comprise of a fenced Work Camp, providing accommodation for 30 prisoners and associated staff, including a series of steel framed single…
  • Subiaco Hotel Redevelopment

    Location:
    Subiaco WA
    Consultant:
    CHRISTOU Design Group
    Status:
    Completed
    The Subiaco Hotel Building nestled in the heart of Subiaco is a historical building which has been given an extensive transformation into an impressive yet elegant hotel.   The staged project involved a complete overhaul of the bars, restaurant, kitchen, dining area, mezzanine alfresco and a new upper level supper club, with…
  • Zen Apartments

    Location:
    Northbridge WA
    Consultant:
    Hillam Architects
    Project Value:
    $40 million +
    Status:
    Completed
    The ZEN Apartments development is a Multi-level boutique apartment building situated in the heart of Northbridge, Western Australia. This modern development consists of 37 stylish apartments either side of the vibrant Washing Lane retail precinct and includes, a large underground parking area and a variety of central shopping and community areas. Ascent Structural Steel…
  • Rendezvous Hotel Refurbishment

    Location:
    Scarborough WA
    Consultant:
    Tema International
    Project Value:
    $60 million
    Status:
    Completed
    Located in the heart of the tourist hot spot Scarborough, the Rendezvous Hotel and Esplanade Retail Strip have undergone a large transformation to kick start the major Scarborough Redevelopment Plan. The transformation included a complete refurbishment of the hotel podium and mezzanine levels to include a new grand ballroom, restaurant,…
  • Mandurah Railcar Wash Facilities

    Location:
    Mandurah WA
    Consultant:
    MPS Architects
    Project Value:
    $4 million
    Status:
    Completed
    The Mandurah Electric Railcar Wash Facilities was a building constructed for the Perth Transport Authority Electric train division. The small structural steel building designed by MPS Architects is to be used by the PTA and a railcar wash facility and was completed in Mid-2014. Ascent Structural & Architectural Steel was…
  • Echo 2 Rio Tinto Building

    Location:
    Perth Airport WA
    Consultant:
    Peter Hunt Architects
    Project Value:
    $15 million
    Status:
    Completed
    Rio Tinto’s $15 million “Echo 2” Building located in the Perth Airport business complex of Western Australia, is a 3-story office space and remote operation centre constructed in early 2014.